WAREHOUSING

The warehouse system at Chu Lai International Port spans of over 200,000 m², developed and expanded into specialized zones such as bonded warehouses, CFS warehouses, and general warehouses, etc. The warehouses are equipped with fire protection systems, safety sensors, and CCTV systems, integrated with WMS and ERP platform, effectively connecting with SAP, Oracle, and Bravo software, to manage their goods comprehensively, update quantity of inbound - outbound - inventory in real time continuously and accurately.
  • General warehouses
  • Bonded warehouses
  • CFS warehouse

services

General warehouses

  • Quantity: 5 warehouses
  • Total area: 115,000 m²
  • Storage capacity: 300,000 tons

The warehouse system is scientifically planned and arranged, equipped with racks, shelves, and storage frames suitable for a wide range of goods such as spare parts, electronic devices, tapioca starch, etc. The layout is designed to maximize storage capacity and ensure convenient classification and arrangement of goods.

Storage and preservation processes are strictly implemented and comprehensively monitored, ensuring safety and product quality..

Bonded warehouses

  • Quantity: 6 warehouses
  • Total area: 85,000 m²
  • Storage capacity: 200,000 tons

The bonded warehouse system is built to international standards, offering a wide range of benefits for businesses:

  • Strategic location, easy to access, transport, and customs clearance procurement.
  • Goods are tracked and managed via advanced software systems.
  • Support consulting, quotations, declarations, inbound – outbound procedures, classification, and transportation.
  • Full compliance with customs regulations and import-export tax policies.

CFS warehouse

  • Quantity: 1 warehouse
  • Total area: 3,600 m²
  • Storage capacity: 12,000 tons

The CFS warehouse is an ideal transit point for Less than Container Load (LCL) cargo, offering multiple transport efficiently and cost-effectively solutions:

  • Classifying cargo by type, size, destination, etc.
  • Consolidating, de-consolidating cargo into containers before export.
  • Sorting and separating imported cargo before completing import procedures into Vietnam.

CONTAINER YARD

The container yard at Chu Lai International Port spans 100,000 m², consisting of dry and reefer (cold container) yards. The yard is equipped with RTG cranes and other specialized container handling equipment to enhance container handling and receiving capacity for enterprises and shipping lines.
THILOGI promotes the application of the PL-TOS (Port Logistics - Terminal Operation System) software to improve operational efficiency, ensuring the scientific, effective storage and transportation of containers, accelerating cargo flows and meeting customer demands.